Collusion and bidding can generally be divided into two situations: one. The bidding unit colludes with the bidding unit and the bidding unit operates privatelyThe standard design is generated online for freeUse various means to do enough work. The bidding unit selects the intended winning bidder before entering the bidding process, and then enters the tangible construction market to go through the motions, making the bidding system a formality. Some companies invest a lot of effort in finding business. In order to obtain the private commitment of the construction unit, they use any means to connect with each other.
It would be easier if it was an electronic document like a listThe standard design is generated online for freeThe materials codes in the documents are consistent, the prices are consistent or the changes are regular, etc. What needs to be paid attention to when preparing the tender is prepared by the tender issuing unit or the entrusted design unit, and the bidder is provided with documents requiring the main technical quality, duration and other requirements of the project. It is logical and cannot be inconsistent. Ambiguity language should be refined and short tender documents should also be prepared by the bidder.
The following is the step 1 of the price quantification method to close the bidding. Determine the goal firstThe standard design is generated online for freeThe education policy project or activity you want to evaluate and establish specific questions that need to be answered 2 Design evaluation indicators Depending on the goals, determine the key evaluation indicators can take into account educational achievement, student participation, student satisfaction, parent satisfaction, teacher training effect, etc. 3 Design experiments or questionnaires based on the determined evaluation indicators and design appropriate ones.
The method first bids a certain project, and then adds other projects after winning the bid, so as to increase the overall cost and limit the scope of information release. The non-public bidding method deliberately limits the scope of information release, or does not conduct bidding publicly to avoid open competition. Construction units rely on other companies and prepare different bidding plans to close the bid, excluding other competitors from influencing this behavior seriously undermines the summary of fair competition order in the market.
Or the bid bond comes from different accounts, but the required funds come from the same account or the same person's account. 2 The bid documents are produced in the same way and in the same format, and many forms have the same color. Where there are mistakes in some key links, the printing ink of the two or more bid documents is the same, like the conditions for bidding from the same printer: 1 The bidder has been established in accordance with the law; 2 The preliminary design and design.
The core of cross-bidding is the winning price. The most direct way to prevent cross-bidding should be to win at a reasonable low price. The reasonable low price method is an international practice. The country is currently vigorously implementing it. The actual effect is also very significant. It grasps the essence of bidding and greatly simplifies the principle of bidding and saves construction funds. The reasonable low price method of bidding will not cause bidders to ignore the design of bidding plans because of the principle of price priority. It is precisely because the bid is the lowest price, bidders will be present.
In view of the reasons for the bidding enclosure, it is impossible to completely crack the bidding enclosure, but the following measures can be taken to reduce the occurrence of bidding enclosure. 1 Improve supporting regulations to prevent bidding enclosure and other phenomena from occurring at the source. As the competent department, the supervision of bidding work must be strengthened. Based on in-depth research, quantitative and qualitative indicators must be developed so that those bidding companies should pay huge behavioral costs, and the behavioral costs are much higher than their risk-benefits. Thereby forming a sign for those surrounding the bid.
还没有评论,来说两句吧...